 | Western Mining Corporation / BHP Billition |
| Location: Leinster Nickel Operations. Leinster WA |
| Project: CRE has undertaken several turn key contracts at the Leinster Nickel Operations Minesite.
The sinking and lining of the Northern Vent shaft, this entailed the blind sinking an... |
 |
| |
| |
 | Peak Gold Pty Ltd |
| Location: Peak Gold Mine. Cobar NSW. |
| Project: CRE was contracted to install a 2nd egress headframe and winder on a 4m dia x 900m deep raise bored “New Occidental” shaft and then use this system to fully mesh and bo... |
 |
| |
| |
 | Ulan Coal Mines Ltd |
| Location: Ulan Colliery. Mudgee NSW. |
| Project: Construction of a 5m diameter concrete lined ventilation shaft. This shaft was blind sunk and lined to 50m and then raise bored to 150m. The raise bored shaft was also concrete lin... |
 |
| |
| |
 | Moranbah North Coal (Management) Pty Ltd |
| Location: Moranbah North Coal Mine. Moranbah QLD. |
| Project: Construction of a 6m diameter x 150m deep ventilation shaft. This shaft required the construction to blind presink and concrete line down to 35m where the remaining shaft was raise... |
 |
| |
| |