Shaft Construction
- Design, manufacture, modification, installation and commissioning of the Horadiam set-up for the development of a Ø7.8m ventilation shaft at the Enterprise Mine Project - Mount Isa Mines.
- Design, manufacture, installation and commissioning of an extension of the Woodcutters shaft from 350m to 650m including the Associated Materials Handling System.
- Supervision and construction works associated with equipping and commissioning of the Bounty shaft project.
- Manufacture, installation, roping up and commissioning of an internal Koepe winder installation at the Renison Mine in Tasmania.
- Installation of numerous ground support systems, concrete linings for vertical shafts and horizontal developments utilising mechanical support or grouting techniques.
- Installation of numerous water control systems, grouting in vertical shafts and horizontal developments.
- Design, manufacture and installation of numerous egress ladderways in various mines.
- Detail design, manufacture, supply and installation of equipment for the shaft partition in Southern Cross shaft at Pasminco Broken Hill Mine.
- Design and construction of hydrostatic shaft lining in Miitell shaft, 3100mm diameter, 300m deep.
- Repairs to Cannington Eastern and Western ore passes by lining and ground support.
- Construction of pre-sink at Moranbah North ventilation shaft, 6m dia. By 40m deep and lining of the lower 200m of 5.8m dia. Raise drilled shaft.
- Shaft sink at the Golden Pig mine at Southern Cross WA, 3m by 100m.
- Installation of ground support at Peak mine, 4m diameter 900m deep.
- Construction of pre-sink for the NDVS shaft at Leinster, 5m dia by 70m deep.
- Construction of pre-sink for the RSVS shaft at Leinster, 6m dia. By 70m deep.
- Construction of RSVS shaft at Leinster, 7m dia by 810m deep by horadiam stripping of a 2.4m diameter raise drilled shaft.