Client / Location Nature of Work Value
WMC Resources    
Olympic Dam SA
25 ventilation shafts, including
646m x 4.5m vent shaft
614m x 4.5m vent shaft

$1.5 Million
$1.4 Million
Lancefield WA
390m x 4.1m vent shaft $1.0 Million
Leinster WA
6 x 90m x 4m horizontal drives $1.0 Million
Kambalda WA
530m x 3.1m shaft $1.4 Million
     
Pasminco Mining
   
Broken Hill NSW 588m x 4.1m shaft $2.1 Million
  820m x 1.8m shaft $1.4 Million
Rosebery, Tas 650m x 4.5m shaft, inc 38m lined pre-sink
$3.0 Million
     
Normandy Mining
   
Scuddles WA 350m x 4.1m shaft $1.0 Million
Callie NT 300m x 4.5m shaft inc. strip and line from 1.8m drilled shaft for top 112m. $2.2 Million
Ulan Coal Mines
   
Ulan, NSW 180m x 5.0m shaft fully concrete lined with a 47m pre-sink. $2.2 Million
     
Renison Goldfields
   
Henty Tas 377m x 3.0m underground shaft. $1.0 million
     
Capricorn Coal Management
 
German Creek, Qld Two 200m x 4.8m shafts, inc.
ground support and lining.
$2.6 million
     
Springvale Colliery
   
Lithgow, NSW Two 140m x 4m shafts fully concrete lined. $2.5 million
     
Northside Storage Tunnel Alliance  
Sydney NSW 154m x 5m shaft $1.0 million
     
Homestake Australia    
Darlot, WA 355m x 3.8m shaft, inc. 70m deep lined pre-sink and installation of ground support. $2.8 million
     
Rio Tinto    
Cobar, NSW 900m x 3.1m shaft
900m x 4.0m shaft
$3.2 million